Publications
The following are the documents used by Projects, Engineering and Storm Water Management staff for implementation and review of compliance top the City’s Ordinances, Design Criteria, Standard Details, Flood Plain Management, Technical Specifications, and Strom Water Policy.
Standard Details
Construction Barricade & Miscellaneous Standard Details
General Construction Notes
Meters & Vault Standard Details
Pavement Marking Standard Details
Paving Standard Details
Project Cover Sheet
Sanitary Sewer Standard Details
Signatures Block
Storm Sewer Standard Details
Storm Water Pollution Prevention Plan Standard Details
Water Distribution Standard Details
Design Criteria
Design Criteria Manual
Document 01100 – Minimum Conceptual Drawing Requirements
Document 01105 – Minimum Construction Drawing Requirements
Capital Improvements Program (CIP)
Updated as of March 2011
Draft - Five Year General Project Sheets
Draft - Beyond Five Year General Project Sheets
Draft - Five Year Water & Sewer Project Sheets
Draft - Beyond Five Year Water & Sewer Project Sheets
Flood Plain Management
2008 Floodplain Update / CRS Information
City
Flood Zone Ordinance
Flood Zone Determination Form
Development Permit
Mitigation Action Plan
County
Galveston County Consolidated Drainage District
Harris County Office of Emergency Management
Harris County Flood Control District
State
Texas Commission on Environmental Quality
Texas Department of Emergency Management
Federal
FEMA Flood Insurance Rate Map (FIRM) - Interactive
FEMA Flood Insurance Rate Map - Scanned Document
Federal Emergency Management Agency
U.S. Army Corps of Engineers Clear Creek Project
Storm Water Management
Storm Water Ordinance
Document 01410 – TPDES Requirements
Document 01411 – TPDES NOI Form 20022
Document 01412 – TPDES Construction Site Notice
Document 01413 – TPDES Operators Information Form
Document 01414 – Contractors – Subcontractors Certification for TPDES Permitting
Document 01418 – Notice of Termination (NOT) Form
Technical Specifications
00005 – Table of Contents
000 - Front End Documents
010 - Landowners Bill of Rights
011 – General Requirements
012 – General Requirements
013 – General Requirements
014 – General Requirements
015 – General Requirements
016 – General Requirements
017 – General Requirements
018 – Temporary Utility Identification Markings
020 – Erosion Control Systems
021 – Site Work
022 – Piping
023 – Manholes
024 – Potable Water Systems
025 – Sanitary Sewer Systems
026 – Storm Sewer Systems
027 – Base Courses
028 – Paving
029 – Landscape
030 – Concrete








